On May 14, 2025, the 4.1MWp rooftop distributed PV project developed by Suzhou Tonghe New Energy Group for Guangdong Guoxing Smart Supply Chain Management Co., Ltd. was successfully grid-connected, setting a new benchmark for zero-carbon park development.
Founded in 2000, Lianfeng Group is a comprehensive enterprise focusing on industrial park investment, development, construction and operation. Its businesses cover modern logistics, industrial real estate, asset management, park value-added services, full food industry chain and equity investment. By 2022, its developed and managed asset area exceeded 1 million ㎡, with property management area over 8 million㎡.
With an installed capacity of 4.1MWp covering 31,000㎡, the project adopts the self-consumption with surplus fed to grid model.
As another landmark cooperation with Lianfeng Group following the Foshan project, the PV system features flush rooftop installation with consistent inclination angles to maximize installed capacity and generation revenue while ensuring safety. It fully meets on-site power demand for lighting, sorting and packaging, increases green power ratio, lowers indoor temperature, accelerates decarbonization and supports Lianfeng Group in building zero-carbon parks with integrated economic and environmental benefits.

